Manufacturing · 4-plant industrial group

Closed-loop operations across plants, products and P&L.

A four-plant industrial group operating on tribal knowledge, conflicting spreadsheets, and lagging monthly reviews. KYRO EDGE rebuilt the operating model end-to-end.

−42%
Cycle time
98.6%
OTIF
−30 hrs/wk
Manual reporting
+27%
Forecast accuracy
Challenge

What was breaking.

  • Production, quality and supply data lived in four disconnected stacks across plants.
  • Leadership reviewed performance on a lagging monthly cadence with no consensus on the numbers.
  • Planning and dispatch resolved differences inside spreadsheets — every week.
  • No early-warning signal for quality, downtime or supplier risk.
Approach

How we re-engineered the operating model.

01

Operating model redesign

Re-architected the planning, production and review cadence around real-time signal rather than monthly retrospect.

02

Unified data fabric

Built a single data layer across MES, ERP and quality systems with one shared definition of every KPI.

03

Executive operating console

Designed a CEO-grade dashboard surfacing throughput, OTIF, quality and supplier health in real time.

04

Workflow automation

Automated the highest-friction hand-offs: planning to dispatch, quality to root-cause, supplier to procurement.

"KYRO EDGE didn't sell us software — they redesigned how we operate. The clarity we have now is what we'd been trying to buy for years."
Managing Director, Industrial Group
Next Step

Let's diagnose where your business actually loses momentum.